One trade, counted and marked on every drawing sheet.
The electrical package for a large new house with a basement and pool. See the trade report, then the plans with every counted item and measured run marked and keyed to the bill.
Estimate total
A$500,950.10
Including GST, as issued.
Price tier it matches
Residential Trade Estimate Pack
A$399, GST included. One trade on one project. See the trade packs
Electrical services for a large new house with a basement garage, cinema, gym, wellness room and pool.
The estimate total is shown. Detailed pricing and formulas are intentionally withheld.
Explore the report structure, scope, plans and representative quantities. Your purchased pack includes the complete pricing and working files.
What is in this pack
Every document below belongs to the same estimate. Open any of them in the viewers on this page.
Cost report
Trade report
The trade figure and what it covers and leaves out, the measurement schedule, cost by system, certainty, the five items that move the price, savings options and the contractor's brief.
Preview: 6 of 37 pages
Client summary
Client summary
A short summary of the total and what drives it, written for an owner, investor or lender.
All 5 pages shown
Marked-up plans
Marked-up plans
Issued drawing sheets with every counted item and measured run marked, each mark keyed to its bill line, with a key panel on every sheet.
Preview: 8 of 59 sheets
Bill of quantities
Bill of quantities
The priced bill of quantities with its programme, cash flow, measurement schedule and risk registers. Rates and formulas are hidden here.
Preview: 5 of 27 worksheet tabs
Trade procurement
Trade procurement pack
The trade split into packages with scope and quantities and no rates, with a quote return form for subcontractors and suppliers.
Preview: 5 of 8 worksheet tabs
Inside the trade report
The trade figure and what it covers and leaves out, the measurement schedule, cost by system, certainty, the five items that move the price, savings options and the contractor's brief. Detailed monetary values are masked in the public copy.
Preview: 6 of 37 pages shown. Every job receives the full report.

This is page 1 of 37 in the full document. On-screen public copy. Detailed monetary values are intentionally masked. The original file is not loaded by this viewer.
The client summary
A short summary of the total and what drives it, written for an owner, investor or lender. Detailed monetary values are masked in the public copy.
All 5 pages of this summary are shown.

On-screen public copy. Detailed monetary values are intentionally masked. The original file is not loaded by this viewer.
Open the marked-up plans
Issued drawing sheets with every counted item and measured run marked, each mark keyed to its bill line, with a key panel on every sheet. Dollar amounts are removed and quantities are shown as issued.
Preview: 8 of 59 sheets shown. Every job receives the full set.

This is sheet 1 of 59 in the full set. On-screen public copy. Quantities and marks are shown as issued. Dollar amounts are removed. The original file is not loaded by this viewer.
Explore the bill of quantities
The priced bill of quantities with its programme, cash flow, measurement schedule and risk registers. Rates and formulas are hidden here. A reduced preview of the first worksheet tabs.
Explore the bill of quantities
Preview: 5 of 27 worksheet tabs shown, with the first pages of each tab. Every job receives the full workbook.
The original workbook, with sensitive pricing masked.
Browse the worksheet tabs and line item detail. Rates, pricing references and sensitive amounts are intentionally hidden. Formulas and the original Excel file are not sent to your browser.

Showing the first 3 of 19 pages of this tab. Original worksheet layout, headings and line items. Use zoom to inspect the detail. Your purchased pack includes the full costed workbook and editable pricing functionality.
See how the trade scope is presented
The trade split into packages with scope and quantities and no rates, with a quote return form for subcontractors and suppliers. A reduced preview of the first worksheet tabs.
Explore the procurement workbook
Preview: 5 of 8 worksheet tabs shown, with the first pages of each tab. Every job receives the full workbook.
The original workbook, with sensitive pricing masked.
Browse the worksheet tabs and line item detail. Rates, pricing references and sensitive amounts are intentionally hidden. Formulas and the original Excel file are not sent to your browser.

Original worksheet layout, headings and line items. Use zoom to inspect the detail. Your purchased pack includes the full costed workbook and editable pricing functionality.
Want the full files?
The complete PDFs and workbooks are not published on this page. Email us, say which sample you would like, and we will reply with the files.
Email us about this sampleSee the detail. Then price your own project.
Upload your plans and receive a detailed cost report, a live-formula BOQ and a procurement pack for subcontractor pricing.
Residential Trade Estimate Pack A$399. GST included. Residential estimates and Trade Estimate Packs are typically delivered within 1 business day from payment and a complete document set.