For a backyard granny flat, start at the existing house. Where will the plumber connect, how will materials reach the slab, and what has to go back when the work is finished? Price those items alongside the dwelling, even if they sit outside its footprint.

Trace the services back to the connection

Send the site plan as well as the floor plan. Mark the proposed service routes, the connection points and the surfaces each route crosses. The plumber needs the connection depth as well as the distance. Flag any depth that still needs a site check.

Measure the narrowest gate and mark the path from the unloading spot to the slab. Tell the trades which fences and paths must stay. If a fence panel can come out for access, include its removal and replacement in the proposal.

Illustrative measurement of a backyard trench

On an illustrative plan, a trench runs 14 m through lawn and 6 m under pavers. Allow 20 m of trench. If the strip of paving to lift is 0.8 m wide, there are 4.8 m² of pavers to lift, store and relay.

Ask the plumber where their price ends. If it ends at backfill, give the landscaper the 4.8 m² and describe the lawn repair separately. That accounts for both surfaces while counting the excavation once.

Build up the cost from the drawings

EstiFlow’s published residential cost study withholds a granny flat rate because too few reliable floor areas were available. For a proposal, count the kitchen, bathroom and hot water unit from the drawings. Then price the slab, walls, roof and external works in their own quantities.

Questions about this estimate

What does a granny flat estimate cost?

EstiFlow charges A$299 including GST for an estimate of one standalone secondary dwelling. The fee also applies to alterations to an existing granny flat. The pack includes the cost report and an editable bill of quantities.

What if the sewer connection point is still unknown?

Show the route you have allowed for and identify who will confirm the connection. Ask the plumber to separate the connection allowance from the measured trench. Replace that allowance once the route and depth are known.