Skip to content
Trade estimating

Roofing takeoff for sheet cover, ridges and gutters

For a sheet roof, the slope sets the length to cover and the width across the slope sets the number of sheets. Measure each roof face before combining quantities. Roofing is a named trade in the EstiFlow catalogue.

Measure each roof face to its edges

Use the roof plan for eave and ridge lengths. Take the slope length from the section, including the overhang shown. Record the sheet profile and laying direction. On a hip or valley roof, mark where each sheet stops so the cutting list follows the shape of the face.

Trace ridge caps, valleys, apron flashings and gutters in metres by profile. Count outlets, stop ends and pipe flashings individually. Record underlay by covered area and identify any laps separately when working out the material order.

Illustrative takeoff for a gable roof

Assume two equal rectangular faces. Each eave is 8.4 m long. From the eave edge to the ridge the horizontal run is 3 m and the rise is 1.25 m. The sloping side of that right triangle is 3.25 m. Each face covers 8.4 × 3.25 = 27.3 m², giving 54.6 m² across the roof.

Assume each sheet spans the slope and covers 0.75 m of eave after the side lap. Each face needs 8.4 ÷ 0.75 = 11.2 sheet widths. Round up on each face to get 12 sheets per face, or 24 across the roof. The ridge cap covers one 8.4 m ridge. Its stock length and end laps are separate order details.

Locate the handover at gutters and penetrations

State who supplies the gutter outlet and who connects the downpipe to it. For a duct through the roof, identify who forms the opening, supplies the upstand and fits the weather flashing. Check scaffold and lifting access against the builder’s inclusions.

Questions about this estimate

Which sheet width goes into the count?

Use the specified profile’s effective cover after side lap. Measure the face across the direction the sheets run. Using the full unlaid width would give too much coverage per sheet.

Does a rooflight reduce the number of sheets?

Mark the rooflight on the sheet layout. A sheet cut around an opening may still use a full blank. Show any change to the sheet list and measure the flashing around the opening separately.